Electrical safety in the rented sectors is one of the few areas of property compliance with a clear, dated, testable obligation attached to it. GOV.UK guidance states that electrical installations in rented properties must be inspected and tested by a qualified person at least every five years. For the social rented sector, transitional provisions attach a specific date to older tenancies.

What the guidance actually requires

Two things sit alongside each other: inspection and testing of the electrical installation, and checks of electrical equipment provided by the landlord. Where a report identifies remedial or further investigative work, it generally must be completed within 28 days, or sooner if the report specifies, subject to the regulations and the practical provisions within them. Landlords must be able to evidence all of this — which is why record quality is now part of the specification, not an afterthought.

Why this becomes programme work

A large housing provider is not commissioning an EICR. It is commissioning a rolling programme across thousands of properties, with access management, no-access procedures, appointment scheduling, remedial follow-up, quality auditing and reporting into asset systems. The technical work is the smaller part of the challenge. The delivery capability is what gets a contractor appointed.

The work categories that follow

  • Electrical installation condition reports and periodic testing across portfolios
  • Landlord-provided electrical equipment checks
  • Fault diagnosis and further investigation arising from coded observations
  • Remedial works to close out C1, C2 and FI items within required timescales
  • RCD and protective device improvements where required
  • Distribution board and consumer unit work where justified by the installation
  • Earthing and bonding upgrades
  • Repairs to accessories, circuits, containment and communal systems
  • Certification, documentation and evidence packs suitable for audit

What housing providers look for in a contractor

Capacity is the first filter: can you resource a scheduled programme without abandoning your reactive commitments? After that come consistency of coding standards between engineers, appointment coordination and first-time access rates, multi-site geographic coverage, competent supervision, verifiable qualifications and registrations, and reporting that arrives in a usable format rather than as a folder of PDFs.

Contractors who have built these systems already are in a strong position. Contractors who have the technical capability but have not yet packaged the evidence should treat vetting as the moment to get it in order.

This is B2B work, not domestic homeowner work

Although the properties are homes, the client is a housing provider, managing agent, framework holder or FM organisation running a managed portfolio. Instructions come through asset and compliance teams, not householders. That distinction shapes everything from pricing structure to how variations are approved, and it is the type of work Regency focuses on.

Electrical requirements are already coming through the network. We are expanding vetted contractor coverage now — particularly inspection, testing and remedial capability — ahead of the wider 2026–27 compliance cycle set out in our overview of the regulation changes landing across 2026 and 2027.

Official sources

Frequently asked questions

Which tenancies does the 1 November 2026 date apply to?
Transitional provisions apply to social housing tenancies granted before 1 December 2025, requiring initial electrical installation inspection and testing, and checks of landlord-provided electrical equipment, before 1 November 2026.
How often must inspections happen after that?
GOV.UK guidance states electrical installations in rented properties must be inspected and tested by a qualified person at least every five years.
How quickly must remedial work be completed?
Remedial or further investigative work identified in a report generally must be completed within 28 days, or sooner where the report specifies, subject to the regulations and their practical provisions.
Is this domestic work?
The properties are homes, but the client is a housing provider, managing agent or FM organisation managing a portfolio. Regency treats this as professionally managed B2B work rather than homeowner domestic work.