An approved contractor list is the difference between procurement and improvisation. With one, every new job starts from a set of businesses already checked for insurance, competence and coverage. Without one, every job restarts the search from zero — usually under time pressure, which is where bad appointments come from.
Step 1: Map what the list needs to cover
Start from demand, not supply. For each building or portfolio area, list the trades actually required — typically electrical, plumbing, HVAC, fire safety, roofing and general maintenance as the core, plus the specialists your stock demands — and the geography each must cover. The gaps in that grid are your sourcing targets.
Step 2: Set the entry criteria
Write down what 'approved' means before assessing anyone, so the bar cannot quietly move per candidate. A workable baseline:
- Insurance — public liability at a level appropriate to your properties, plus employer's liability where applicable, with certificates on file
- Competence — qualifications, scheme memberships or third-party certifications relevant to the trade, plus evidence of comparable commercial work
- Health and safety — policy documentation and sample risk assessments and method statements
- Business standing — trading history, references from comparable clients, and financial stability proportionate to contract size
- Capacity and coverage — honest answers about service area and availability, not aspiration
Our guide to contractor documents details the paperwork behind each line.
Step 3: Source candidates
Candidates come from referrals, incumbent suppliers, trade bodies and networks. The practical constraint is time: verifying a single contractor properly takes real effort, which is why pre-vetted networks earn their place. Regency Contractors Network reviews contractors before listing and structures their profiles — services, coverage, credentials — so the selection stage starts from organised information rather than a cold search.
Step 4: Onboard properly
- Collect and file the documentation from your criteria — with expiry dates recorded, not just PDFs saved
- Agree commercial terms in calm conditions — rates, call-out charges, payment terms
- Set documentation expectations — what reports and certificates each job must produce
- Start with contained work — a first job that tests reliability before anything critical depends on the relationship
Step 5: Keep the list alive
Approved lists rot quietly: insurance lapses, key staff leave, coverage changes. Diarise document expiry chasing, review performance annually — attendance, first-fix rate, documentation quality, pricing drift — and prune. A list nobody maintains converges back to improvisation with extra steps. The definitional questions behind all this are covered in what is an approved contractor?
Frequently asked questions
- How many contractors should an approved list hold?
- Enough for at least two options per critical trade per area. Beyond that, list size should follow workload — a huge list nobody manages is worse than a compact one that is current.
- How often should approved contractors be re-checked?
- Insurance and time-limited certifications at every expiry; the broader review — performance, references, terms — annually is a common rhythm.