How to Build an Approved Contractor List

An approved contractor list turns every future job from a search into a selection. Here is how to build one that actually stays useful.

By Regency Contractors Network

Organised contractor files and binders on a shelf in a facilities office

An approved contractor list is the difference between procurement and improvisation. With one, every new job starts from a set of businesses already checked for insurance, competence and coverage. Without one, every job restarts the search from zero — usually under time pressure, which is where bad appointments come from.

Step 1: Map what the list needs to cover

Start from demand, not supply. For each building or portfolio area, list the trades actually required — typically electrical, plumbing, HVAC, fire safety, roofing and general maintenance as the core, plus the specialists your stock demands — and the geography each must cover. The gaps in that grid are your sourcing targets.

Step 2: Set the entry criteria

Write down what 'approved' means before assessing anyone, so the bar cannot quietly move per candidate. A workable baseline:

  • Insurance — public liability at a level appropriate to your properties, plus employer's liability where applicable, with certificates on file
  • Competence — qualifications, scheme memberships or third-party certifications relevant to the trade, plus evidence of comparable commercial work
  • Health and safety — policy documentation and sample risk assessments and method statements
  • Business standing — trading history, references from comparable clients, and financial stability proportionate to contract size
  • Capacity and coverage — honest answers about service area and availability, not aspiration

Our guide to contractor documents details the paperwork behind each line.

Step 3: Source candidates

Candidates come from referrals, incumbent suppliers, trade bodies and networks. The practical constraint is time: verifying a single contractor properly takes real effort, which is why pre-vetted networks earn their place. Regency Contractors Network reviews contractors before listing and structures their profiles — services, coverage, credentials — so the selection stage starts from organised information rather than a cold search.

Step 4: Onboard properly

  1. Collect and file the documentation from your criteria — with expiry dates recorded, not just PDFs saved
  2. Agree commercial terms in calm conditions — rates, call-out charges, payment terms
  3. Set documentation expectations — what reports and certificates each job must produce
  4. Start with contained work — a first job that tests reliability before anything critical depends on the relationship

Step 5: Keep the list alive

Approved lists rot quietly: insurance lapses, key staff leave, coverage changes. Diarise document expiry chasing, review performance annually — attendance, first-fix rate, documentation quality, pricing drift — and prune. A list nobody maintains converges back to improvisation with extra steps. The definitional questions behind all this are covered in what is an approved contractor?

FAQ

Frequently asked questions

How many contractors should an approved list hold?
Enough for at least two options per critical trade per area. Beyond that, list size should follow workload — a huge list nobody manages is worse than a compact one that is current.
How often should approved contractors be re-checked?
Insurance and time-limited certifications at every expiry; the broader review — performance, references, terms — annually is a common rhythm.